Provide enough information to allow the selection of the manufacturer product to meet requirements. This information may also be used to replace the installed product during the operation stage of the building's lifecycle. Information covering the execution of the deliverable should also be provided in the associated specification.
Name |
Definition |
|
Manufacturer |
The Manufacturer of the Chilled water cooling coils. |
|
Standards |
An example value being To BS 5141-1 and BS EN 1216. |
|
Duty - Air volume |
The Duty - Air volume of the Chilled water cooling coils. |
|
Duty - Air velocity |
The Duty - Air velocity of the Chilled water cooling coils. |
|
Duty - Air temperature - Air on dry bulb temperature |
The Duty - Air temperature - Air on dry bulb temperature of the Chilled water cooling coils. |
|
Duty - Air temperature - Air on wet bulb temperature |
The Duty - Air temperature - Air on wet bulb temperature of the Chilled water cooling coils. |
|
Duty - Air temperature - Air off dry bulb temperature |
The Duty - Air temperature - Air off dry bulb temperature of the Chilled water cooling coils. |
|
Duty - Air temperature - Air off wet bulb temperature |
The Duty - Air temperature - Air off wet bulb temperature of the Chilled water cooling coils. |
|
Duty - Water resistance |
The Duty - Water resistance of the Chilled water cooling coils. |
|
Chilled water flow temperature |
An example value being 6°C. |
|
Chilled water return temperature |
The Chilled water return temperature of the Chilled water cooling coils. |
|
Materials |
An example value being Solid drawn copper tubes, electro-tinned, with aluminium fins. |
|
Tube wall thickness (minimum) |
The Tube wall thickness (minimum) of the Chilled water cooling coils. |
|
Fin thickness (minimum) - Aluminium |
The Fin thickness (minimum) - Aluminium of the Chilled water cooling coils. |
|
Fin thickness (minimum) - Copper |
The Fin thickness (minimum) - Copper of the Chilled water cooling coils. |
|
Fin spacing (maximum) |
The Fin spacing (maximum) of the Chilled water cooling coils. |
|
Casing - Finish |
The Casing - Finish of the Chilled water cooling coils. |
|
Casing - Return bends |
The Casing - Return bends of the Chilled water cooling coils. |
|
Condensate drain trays - Material |
The Condensate drain trays - Material of the Chilled water cooling coils. |
|
Condensate drain trays - Thickness (minimum) |
The Condensate drain trays - Thickness (minimum) of the Chilled water cooling coils. |
|
Condensate drain trays - Finish |
The Condensate drain trays - Finish of the Chilled water cooling coils. |
|
Condensate drain trays - Vertical interval spacing (maximum) |
The Condensate drain trays - Vertical interval spacing (maximum) of the Chilled water cooling coils. |
|
Condensate drain trays - Drain connection size (minimum) |
The Condensate drain trays - Drain connection size (minimum) of the Chilled water cooling coils. |
|
Eliminator plates - Condition |
The Eliminator plates - Condition of the Chilled water cooling coils. |
|
Eliminator plates - Position |
The Eliminator plates - Position of the Chilled water cooling coils. |
|
Eliminator plates - Material |
The Eliminator plates - Material of the Chilled water cooling coils. |
|
Draining and venting |
An example value being Provide plugged connections in headers for drain cocks and air vents. |
|
Drain trap material |
An example value being Copper. |
|
Access doors for maintenance |
The Access doors for maintenance of the Chilled water cooling coils. |
|
Water test pressure |
The Water test pressure of the Chilled water cooling coils. |
|
Protection |
An example value being Fit blank flanges or caps to pipe connections after manufacture. |
|
Accessories |
An example value being Antifreeze thermostat. |
|